Shaker pine trestle dining table: plans, cut list and shop drawings
A long, low-slung trestle dining table in pine: a single wide breadboard-ended top carried on two shaped trestle standards, tied together by a deep central stretcher rail with coved ends that is through-tenoned and wedged into the posts. All structural joints are drawbored mortise and tenon; the top floats on buttons so it can move seasonally across its 760 mm width.
- Overall (W × D × H)
- 2400 × 760 × 740 mm
- In inches
- 94.5 × 29.9 × 29.1 in
- Parts
- 9
- Joints
- 5
- Difficulty
- advanced
- Estimated time
- 34 h
This is the plan Sawbench produced from photographs of an existing piece, published as it came out, with no hand correction. The sizes are read from the photos, so check every dimension against your own design and stock before you cut.
Elevations
Cut list
Finished sizes in millimetres, length × width × thickness.
| ID | Part | Qty | Size (mm) | Material |
|---|---|---|---|---|
| TOP | Top field (glued panel) | 1 | 2300 × 760 × 32 | Eastern white pine, 8/4 stock dressed to 32 mm, 3-4 boards edge-glued |
| BB | Breadboard end | 2 | 760 × 50 × 32 | Eastern white pine, 8/4 dressed to 32 mm |
| POST | Trestle post (standard) | 2 | 598 × 90 × 44 | Eastern white pine, 8/4 dressed to 44 mm |
| FOOT | Trestle foot | 2 | 600 × 90 × 44 | Eastern white pine, 8/4 dressed to 44 mm |
| CLEAT | Trestle top cleat (batten) | 2 | 600 × 80 × 44 | Eastern white pine, 8/4 dressed to 44 mm |
| RAIL | Central stretcher rail | 1 | 1700 × 180 × 32 | Eastern white pine, 8/4 dressed to 32 mm |
| BTN | Top button | 8 | 60 × 30 × 19 | White oak, 4/4 dressed to 19 mm |
| PEG | Drawbore peg | 16 | 60 × 10 × 10 | Riven white oak |
| WDG | Tenon wedge | 4 | 60 × 20 × 6 | White oak |
Joinery
| ID | Joint | Where | Cutting numbers |
|---|---|---|---|
| J1 | mortise and tenon | Foot of each trestle post into the shaped foot | Mortise 70 mm long x 20 mm wide x 30 mm deep, centred 300 mm along the 600 mm foot; matching tenon 30 mm long x 70 mm wide x 20 mm thick on the post bottom, with 10 mm shoulders all round. Drawbored with two 10 mm oak pegs, holes offset 1.5 mm. |
| J2 | mortise and tenon | Top of each trestle post into the underside of the top cleat | Mortise 70 mm long x 20 mm wide x 30 mm deep in the 80 mm deep cleat, centred 300 mm along its 600 mm length; tenon 30 mm long x 70 mm wide x 20 mm thick on the post top. Drawbored with two 10 mm pegs. |
| J3 | mortise and tenon | Each end of the central stretcher rail, through the trestle post (intentional through, wedged tenon) | Through mortise 80 mm high x 20 mm wide cut right through the post's 44 mm thickness — mortise depth is therefore 44 mm, a deliberate through cut — its centre 558 mm up from the post's lower shoulder (618 mm above the floor). Tenon 60 mm long x 80 mm wide x 20 mm thick: 44 mm passes through the post and 16 mm protrudes, kerfed twice and locked with two 60 x 20 x 6 mm oak wedges. |
| J4 | other | Breadboard ends to each end of the top | Tongue 15 mm long x 10 mm thick, centred in the 32 mm thickness, full 760 mm width; groove 10 mm wide x 16 mm deep in the breadboard. Three 10 mm drawbore pegs per end on 275 mm centres; the centre peg hole is round and glued, the two outer holes in the tongue are elongated to 16 mm so the top can move. |
| J5 | knock down fitting | Top to trestle cleats — eight oak buttons | 6 mm wide x 10 mm deep groove ploughed along both long faces of each cleat, 12 mm down from its top edge. Button tongue 8 mm long x 10 mm thick; each button fixed to the top underside with one 4.5 x 35 mm steel countersunk screw. Four buttons per trestle, two per side. |
Lumber to buy
| Stock | Nominal | Qty | Yields |
|---|---|---|---|
| Eastern white pine, 8/4 (50 mm) rough-sawn, kiln dried, clear-ish grade | 50 x 250 mm x 2.5 m | 4 | TOP (edge-glued panel, 3 boards used, 1 spare/offcut for BB) |
| Eastern white pine, 8/4 (50 mm) rough-sawn, kiln dried | 50 x 200 mm x 2.1 m | 1 | RAIL (1700 x 180 x 32 mm, ripped from one wide board) |
| Eastern white pine, 8/4 (50 mm) rough-sawn, kiln dried, clear | 50 x 150 mm x 2.4 m | 2 | POST x2, FOOT x2, CLEAT x2 (all 44 mm finished parts) |
| Eastern white pine, 8/4 (50 mm) rough-sawn, kiln dried | 50 x 100 mm x 1.8 m | 1 | BB x2 (two 760 x 50 x 32 mm breadboards) plus test offcuts |
| White oak, 4/4 (25 mm) dressed, straight-grained | 25 x 100 mm x 1.0 m | 1 | BTN x8, WDG x4 |
| White oak billet for riving pegs, straight-grained, no runout | 40 x 40 mm x 700 mm | 1 | PEG x16 (riven and whittled octagonal, 10 mm x 60 mm) |
Cutting diagram
Assembly sequence
Mill and acclimatise stock
Bring all pine into the shop and sticker it for at least a week before cutting. Rough-cut every part 50 mm over length, then face, edge, thickness and rip: TOP boards and RAIL and BB to 32 mm; POST, FOOT and CLEAT to 44 mm. Leave the oak for BTN, WDG and PEG in the billet for now. Mark a face side and face edge on every piece and keep a cutting list taped to the bench.
Glue up the top panel
Arrange three or four 32 mm boards for the 760 mm width, alternating cup and matching grain and colour. Joint the mating edges to a spring joint, dry-clamp to confirm no gaps, then glue with PVA and clamp alternately above and below the panel. Leave the panel 2320 mm long for now and let it cure overnight before removing clamps.
Flatten, trim and tongue the top
Scrape and plane the panel flat, then sand to 120 grit. Crosscut it square to a finished 2300 mm. Rout a tongue 15 mm long x 10 mm thick, centred in the 32 mm thickness, across both full 760 mm ends — two passes, one from each face, with an edge guide so the tongue self-centres. Lightly chamfer the underside edges.
Make and fit the breadboard ends
Cut both BB to 760 x 50 x 32 mm. Plough a groove 10 mm wide x 16 mm deep, centred, the full length of the inner edge. Dry-fit each breadboard onto the top tongue; it should slide on with hand pressure and the outer face should finish flush with the top surfaces. Bore three 10 mm peg holes through each breadboard on 275 mm centres (centre hole and one 275 mm either side), stopping blind at 28 mm so the pegs never show on the underside.
Drawbore and peg the breadboards
With the breadboard clamped on, transfer the three hole centres onto the tongue with the 10 mm bit. Remove the breadboard, bore the tongue holes 1 mm closer to the shoulder; then elongate the two OUTER tongue holes to 16 mm along the length of the breadboard with a round file so the top can move. Glue only the centre 150 mm of the tongue, reassemble, and drive three whittled oak pegs from the top face. Trim the pegs flush and repeat at the other end.
Shape the feet and the cleats
Cut FOOT and CLEAT to 600 mm. Transfer the given face profiles: the foot sweeps from 90 mm deep at the centre down to 35 mm at the toes with a flat 120 mm bearing pad at each end; the cleat sweeps from 80 mm at the centre down to 40 mm at the ends. Bandsaw outside the line and fair with spokeshave and rasp. Then plough a 6 mm wide x 10 mm deep button groove along both long faces of each cleat, 12 mm down from its top edge.
Cut the post tenons and the through mortises
Cut POST to 658 mm overall (598 mm shoulder to shoulder plus 30 mm tenon each end). Saw a tenon 30 mm long x 70 mm wide x 20 mm thick on each end, with 10 mm shoulders all round, centred in the 44 mm thickness. Then lay out the through mortise for the stretcher: 80 mm high x 20 mm wide, centred on the post width, its centre 558 mm up from the lower shoulder. Chop or rout it halfway from each face so the exit does not tear out.
Cut the foot and cleat mortises
Mark the centre of each FOOT and CLEAT at 300 mm. Chop a mortise 70 mm long x 20 mm wide x 30 mm deep in the top face of each foot and in the underside of each cleat, centred in the 44 mm thickness. Dry-fit each post tenon — it should enter with firm hand pressure and seat with a tight shoulder line.
Make the stretcher rail
Cut RAIL to 1732 mm overall (1612 mm between shoulders plus 60 mm tenon each end) by 180 mm wide. Saw the through tenons 60 mm long x 80 mm wide x 20 mm thick, centred in the 32 mm thickness. Lay out and cut the coved lower-edge sweeps that rise from 112 mm down to the full 180 mm depth near each post, per the profile, and fair them. Finally saw two wedge kerfs 45 mm deep into each tenon, 20 mm in from each edge, and drill a 4 mm relief hole at the bottom of each kerf.
Drawbore and assemble the two trestles
For each trestle, dry-fit post to foot and post to cleat, bore 10 mm peg holes through the mortise cheeks and into the seated tenon, then disassemble and move the tenon holes 1.5 mm toward the shoulder. Glue the joints, reassemble and drive two tapered oak pegs per joint; no clamps are needed. Build both trestles identically and set them aside to cure.
Join the trestles with the wedged stretcher
Stand both trestles on the floor and pass the rail tenons through the post mortises until the shoulders meet the post faces. Apply hide glue sparingly to the kerfed tenon ends only, then drive two oak wedges into each tenon, alternating blows so the tenon swells evenly in the mortise. Bore one 10 mm peg hole through the post into each rail tenon just inside the mortise and drive a peg for belt-and-braces. Saw the wedges and protruding tenon faces flush-ish and chamfer them.
Make and fit the buttons, hang the top
Rip eight oak buttons 60 x 30 x 19 mm and rebate an 8 mm long x 10 mm thick tongue on one end of each; drill and countersink one clearance hole in each. Lay the top face down on blankets, set the base upside down on it so the cleats sit 358 mm and 1998 mm from the left end and centred in the depth, then engage the button tongues in the cleat grooves — two per side per trestle. Leave a 1 mm gap between button body and cleat face so the button pulls down. Pilot-drill 20 mm deep and fix each button with a 4.5 x 35 mm screw.
Final fitting and levelling
Stand the table on a known-flat floor and check for rock; if present, plane a whisker off the high toe pad rather than shimming. Flush-trim any proud pegs, break all arrises with a block plane, and chamfer the post and foot arrises to match the soft edges in the photograph. Add felt pads to the toe pads last, after finishing.
Sanding before finish
Sand the whole piece through 120, 150 and 180 grit, finishing with 220 on the top only. Pay particular attention to the end grain of the breadboards, which will drink finish. Vacuum and wipe down with a damp cloth to raise the grain, let dry, then de-nib at 220.
Tools
- Table saw with rip fence and crosscut sled
- Jointer (150 mm min) and thickness planer
- Bandsaw or jigsaw for the shaped feet and cleats
- Router with 10 mm straight bit, 6 mm slot cutter and edge guide (for the tongue, breadboard groove and button grooves)
- Hollow-chisel mortiser or plunge router with mortise jig
- Brace and 10 mm auger bit, or drill press with 10 mm Forstner
- Cordless drill/driver with 3 mm pilot bit and countersink
- Mortise chisels 20 mm and 6 mm, bench chisels 12/25 mm
- Tenon saw and panel saw
- No. 5 jack plane and No. 7 jointer plane, block plane
- Card scraper and cabinet scraper
- Spokeshave and rasps for fairing the foot and cleat sweeps
- At least 6 x 1200 mm sash or parallel clamps, plus 4 F-clamps
- Drawbore pin set (or two tapered steel pins)
- Dead-blow mallet and 450 g joiner's mallet
- Random orbit sander
- Combination square, 600 mm engineer's square, marking gauge, mortise gauge, 2 m straightedge, winding sticks
- Trammel or compass for cove layout
- Workbench with vice and two trestles/sawhorses
Get a plan like this for your own piece.
Photograph a piece of furniture and Sawbench draws up the plan, with the full A3 drawing set on top of what is shown here. It is opening to a first group of makers.
Join the waitlist